Lighthief Cyprus — Turnkey EPC

Battery Energy Storage
Systems for Cyprus

Utility-scale and C&I BESS — fully engineered and delivered. From 215 kWh C&I containers to 10 MW grid stations. Supply, installation, commissioning and lifetime O&M.

28
Parks Delivered
134 MW
Total Capacity
496 MWh
Energy Deployed
TÜV Certified — EN 50549-2
10-Year Battery Warranty
Cyprus-Based EPC Team
DisperonEMS Cloud SCADA
EAC / DSO Compliant
What We Offer

Complete BESS — Factory to Grid

Lighthief is Cyprus's dedicated BESS EPC contractor. We handle the full project lifecycle — equipment procurement direct from OEM, import logistics, civil works, electrical installation, DSO interface, commissioning and O&M.

  • Direct OEM supply — Linyang Energy (integrator) + Kehua Tech (PCS)
  • Utility-scale skid containers: 1 MW to 10 MW per station unit
  • C&I containerised ESS: 215 kWh Deye MS-GS215 with integrated solar MPPT
  • IEC 61850 / IEC 104 / Modbus — EAC/DSO ready from day one
  • DisperonEMS cloud SCADA — real-time monitoring, trading integration
  • 10-year cell warranty + LTSA contracts available
Request a Proposal →
≥99%
PCS round-trip efficiency — Kehua BCS-C-HUD series
IP65
Ingress protection — outdoor, no shelter required
C5
Anti-corrosion — coastal & marine environments
−35°C
Operating range to +60°C — all Mediterranean climates
Product Range

Utility-Scale & C&I Systems


BCS1250K-C-HUD T1
1.25 MW

BCS1250K-C-HUD T1

Compact single-PCS skid · 20ft container
  • AC Power1.0–1.25 MW
  • DC Bus1000–1500 Vdc
  • AC Output690 Vac 3-phase
  • Transformer1,000–1,250 kVA
  • Efficiency≥99%
  • Grid CodeEN 50549-2 ✓
Request datasheet
BCS2000K-C-HUD T2
2.0–2.5 MW

BCS2000K-C-HUD T2

Dual-PCS skid · 20ft container
  • AC Power2.0–2.5 MW
  • PCS Units2 × BCS1000K or BCS1250K
  • TransformerSL-2000 (2,000 kVA)
  • Container20ft Std (6,058 mm)
  • Efficiency≥99%
  • CommsIEC 61850 / Modbus
Request datasheet
BCS4000K-C-HUD T4
5.0 MW

BCS4000K-C-HUD T4

Four-PCS skid · 40ft HC container
  • AC Power4.0–5.0 MW
  • PCS Units4 × BCS1000/1250K
  • Transformer4,000–5,000 kVA
  • Container40ft HC (12,192 mm)
  • IP RatingIP65
  • CorrosionC5 coastal grade
Request datasheet
BCS10000K-C-HUD T8
8–10 MW

BCS10000K-C-HUD T8

Eight-PCS flagship · 40ft HC container
  • AC Power8.0–10.0 MW
  • PCS Units8 × BCS1000K or BCS1250K
  • Transformer10,000 kVA
  • MV Output22 kV (custom)
  • Container40ft HC (12,192 mm)
  • SLD22 kV available ✓
Request datasheet
Battery Containers (Linyang Atlantic Series) — T1–T8 PCS/transformer skids pair with Linyang Atlantic 4 MWh or 5 MWh battery containers. Contact us for a site-specific BOM.
Applications

What BESS Does for You

Grid Services & Frequency Regulation

Earn revenue providing FCR, balancing energy and voltage support to the TSO/DSO. Response time <200 ms via IEC 104 dispatch command.

FCRaFRRVoltage Support

Solar Firming & Curtailment Recovery

Store excess daytime solar, dispatch at evening peak or on grid request. Eliminates curtailment losses and maximises PPA revenue for co-located PV.

PV + BESSPeak ShiftCurtailment

Energy Arbitrage

Charge during low-price hours, discharge at peak. DisperonEMS integrates with day-ahead and intraday market data to optimise cycles automatically.

DAMIntradayPrice Signal

C&I Peak Shaving

Reduce maximum demand charges for commercial buildings, hotels and factories. Deye MS-GS215 with on-site PV delivers 24/7 reliability and bill savings.

Demand ChargeC&IHotel/Factory

Island Mode & Microgrid

Full off-grid and islanded operation for remote sites. Generator integration (STS, dry contacts) included as standard — no additional inverter required.

Off-gridGeneratorIsland Mode

DSO Connection & Compliance

EAC (Cyprus) grid connection from day one. IEC 61850, IEC 104, Modbus pre-configured. EN 50549-2 TÜV certified — no additional grid study delays.

EAC CyprusIEC 61850Grid Code
Standards & Compliance

Fully Certified Stack

🏅

EN 50549-2

Grid connection — TÜV certified PCS

IEC 62477-1

PCS safety — CB certificate

🌐

IEC 61850

Substation communication & control

📡

IEC 104

Telecontrol / SCADA protocol

🔒

CE-LVD & CE-EMC

Low voltage & EMC directives

🔋

IEC 62619

Battery safety — stationary applications

🔥

UL 9540A

Fire propagation — cell & pack level

🌊

IP65 · C5

Outdoor & coastal environment rated

Why Lighthief

Your BESS Partner in Cyprus

01

Direct OEM Access

Factory-direct from Linyang Energy and Kehua Tech — no middlemen, no mark-up chains. OEM pricing with full traceability and warranty assignment.

03

DisperonEMS — Our Own Platform

Proprietary cloud SCADA built for Linyang/Kehua hardware. Real-time telemetry, market integration, remote dispatch and alarms — no third-party licence fees.

05

Full DSO & Grid Interface

We prepare and submit EAC connection applications, protection relay settings and IEC 104 SCADA point lists on your behalf. Grid connection from day one.

02

Cyprus-Based EPC Team

Local engineers, subcontractors and DSO relationships. EAC permits, crane logistics and customs clearance — 28 parks already delivered across 5 districts.

04

Lifetime O&M Coverage

LTSA contracts from commissioning. Linyang-backed 10-year battery warranty. On-site preventive maintenance, remote diagnostics and spares logistics included.

06

215 kWh to 100+ MWh

C&I Deye systems for commercial premises; Linyang containers for utility scale. One contractor, one contract, any capacity. Multi-site portfolio management available.

Project Journey

From Enquiry to Energisation

1

Site Assessment

Load profile, grid connection point, civil survey, DSO pre-application

2

Technical Design

System sizing, SLD, protection settings, BOM finalisation

3

Contract & Order

EPC contract, OEM purchase order, EAC permit submission

4

Delivery & Install

Factory production (~90 days), sea freight, crane installation, cabling

5

Commission & O&M

OEM commissioning team, DSO energisation, DisperonEMS go-live, LTSA start

Get Started

Ready to deploy battery storage?

Tell us your site location, required capacity and application. We'll respond with a preliminary technical proposal within 5 working days.

Alexander — BESS
Office
28 October Ave 249, Limassol